For construction companies it is essential to coordinate all
the aspects involved in the construction process. The construction software
allows integrating in a single system all the management functions linked to
the design and execution of a construction project, whether civil or public
works, as well as the control of construction costs.
Companies in the construction industry need a system that
can consolidate all data from various sources into a single tool.
For example, the best software for construction scheduling,
includes a supplier database, material management, pricing, architecture
people, an activity list, job scheduling and planning, an asset list,
construction budgets , etc.
A construction management software allows you to track the
progress of your project, automate procedures and reports, create construction
budgets, organize your resources and manage the tasks of your construction
company.
This will give you greater control over the process, a
higher level of service efficiency, significant cost savings and increased
productivity.
With the right tool, any project can be enhanced. Smaller
construction projects need these software for construction scheduling, while
larger projects need the level of control that only the most comprehensive tool
can offer.
There are many software applications that can be used for
construction scheduling. Some of the more popular applications include:
Construction Manager: This application is used to manage
construction projects. It includes features such as scheduling, cost
estimating, and tracking.
Pricing Software: This application can be used to calculate
pricing for construction projects.
Project Management Software: This application can be used to
manage construction projects from start to finish.
1. Command Alkon
It is a building materials technology platform that provides
the heavy building materials business with automation, visibility,
collaboration and simplification. This system automates the business processes
and supply chains of ready-mix concrete, aggregates, asphalt, cement, and
manufactured concrete producers, suppliers, and shippers.
Without a doubt, it has been a year of huge digital
technological innovations in a wide range of industries, including construction
platforms, educational platforms, human resource management platforms and many
more.
Features of AlkonCommand:
- Real-time visibility of material transport.
- Management of orders and delivery of heavy materials.
Integrations: They offer a set of original and manufactured
solutions to expand their radius of action in the construction materials
sector.
2. Concora
Concora is a maker of digital experience platforms that
enable architects, engineers, and contractors to easily get the building
product information they need. It is a system designed specifically to meet the
needs of architects, engineers and contractors, while increasing the
manufacturer's marketing efforts.
Characteristics:
- cloud technology
- Conflict Tracking
- Document management
- Intuitive search functionality
- Multi-product comparisons
- Product selection tools
- Submission Proposal Template
3. GoFor Industries
GoFor is a construction materials and equipment delivery
company that operates on demand and same day. Its staff is made up of industry
specialists with experience in both construction logistics and the creation of
high-tech companies.
Characteristics:
- Real time monitoring
- Online platform with 24/7 access
- Specialized vehicles for transportation of construction resources
Integrations: Easily integrate GoFor APIs into your
technology stack, such as eCommerce, ERP, or POS.
4. Gordian
Gordian provides construction cost data, tools and services
for all stages of the construction life cycle. The construction and operation
of functional facilities depend on intelligent planning. These solutions help
develop physical activity management strategies.
Characteristics:
- Hiring work orders.
- ezIQC system allows you to carry out repairs to facilities and infrastructures.
- Construction Cost Database
- Return on physical assets (CLOTHES)
Integrations: Gordian partners with Sigma Estimates to
integrate RSMeans data into a dynamic 5D BIM platform.
5. HCSS
It is one of the best software for construction scheduling,
including a wide range of estimating and bidding support tools, concentrating
on estimating and bidding tasks.
Characteristics:
- Fleet management.
- Operation management.
- Estimates.
- Document management.
Integrations: Integrates with any accounting system that can
import files, including (but not limited to) the following: ACCPAC, ADP,
Agresso, Alliance Payroll, AmCheck, A-Plus, A-Systems Corporation, BASPay.
6. INSITE IT
INSITE TI is an expert in software for site logistics,
construction progress, deviation management and ongoing production tracking.
Characteristics:
- Manufacturing and logistics tracking.
- Tracking of materials and site logistics.
- Management and documentation of deviations.
- Site management and installation monitoring.
Integrations: Integrates with all HelpSystems products.
7. Intelliwave Technologies
Construction material management software that also offers
tracking solutions for the transportation of materials. Allows global
visibility of the project.
Characteristics:
- Planning.
- Training.
- GPS.
- Specialized transport for each type of transfer.
- 24/7 support
- Documentation.
- Multi-language support.
Integrations: Integration with ERP systems through API.
8. IOFFICE
OFFICE Manager Plus is a cloud-based EAM software that is
designed to help keep track of all elements of heavy construction equipment
assets, while managing both preventative maintenance and urgent needs.
Characteristics:
- Asset Management.
- Construction and heavy equipment maintenance planning and scheduling.
- Inspections.
- API integration and connectivity.
Integrations: Thanks to iOFFICE API integration, it connects
with multiple systems easily.
9. Spark Business Works
It is a company specialized in the development of mobile
applications. SPARK develops custom software, digital goods, and strategic
design to help companies update their processes and brands.
Characteristics:
- Construction
- Professional services
- Manufacturing
- Opening
Benefits of Implementing a Software for Construction Scheduling
From application to completion, manage all your projects in
one place. Companies in the construction industry often work on multiple
projects at the same time, each with its own set of processes and requirements.
Therefore, software for construction scheduling allows you to effectively
manage all activities to meet the demands of all of them.
Improved project management and incident response. Each
project, as said before, entails the administration of tasks, personnel,
available resources, manpower... Construction software can integrate these
procedures to give you full control over each job. In addition, you can quickly
resolve unforeseen events or incidents that may arise.
Comprehensive document management. To streamline work and
deliver reports to managers and clients, combine all the documentation needed
for a project, such as drawings, invoices, materials, permits, quality forms,
and more. Construction companies could benefit from a single ERP system.
Effective use of available resources. You will be able to
manage human resources, machines, materials and subcontracted organizations,
among other things. Provide a high quality service meeting the agreed delivery
times. Control the cost of work.
Accounting and other administrative activities must be
automated. It helps save time by performing calculations and procedures that
the app can do quickly and accurately.
Increase your competitiveness while reducing your costs. You
will ensure profit margins and avoid deviations through exhaustive monitoring
and control of each project. You will also be able to incorporate
state-of-the-art approaches to improve productivity, such as BIM modeling in
construction or the development of digital twins.
Choosing the Right Construction Scheduling Software
When you're in charge of a construction project, you have an
onerous duty to ensure that everything goes according to plan. Construction
management tasks require specific knowledge, the right construction management
software, and experience on the job.
A construction project manager will have various
responsibilities and will need to communicate with various teams, including
clients, suppliers and regulatory bodies involved in the project.
However, with so many project management tool providers on the market, the job can be challenging, especially if you are new to the industry.